With the engine installed and the FlexOFold prop dialed in I finally managed some time to take the Far Reach out on a four day cruise. It had been nearly two years since I had spent any significant time on the boat while underway. I needed to check the engine and the overall condition of the running and standing rigging as well as op-check the boat’s systems, simple though they are, before making the long sail to the Virgin Islands in November. On 10 August I motored the boat down the ICW from the Neuse River to
Continue readingGetting Ready for Sea and Troubleshooting the Cape Horn Windvane
01 Wednesday Dec 2021
Posted Local Sailing, Repairs, Upgrades
in