• About

Far Reach Voyages

~ The sailing, maintenance, and upgrades of a highly modified and custom built Cape Dory 36 sailboat. Please visit our other website, www.farreachvoyage.com, which provides the details, including thousands of photos, of the six year rebuild of the Far Reach from a gutted hull and deck. Additionally, we now have a YouTube channel called Far Reach Voyages which provides video of the rebuild, modifications, and our voyaging experiences.

Far Reach Voyages

Category Archives: Uncategorized

Working on a New Blog Web Address

14 Saturday Oct 2017

Posted by farreachvoyages in Uncategorized

≈ Leave a comment

I am in the process of developing a new web address for this BLOG site.  It may be a few days before activated. If you are a subscriber and your link no longer works, do a google search or check our website http://www.farreachvoyages.com.  On the menu tab there is a link to the blog. I’ll put the new address there when we determine what will be the new address.

Halyard Diverter Installed

18 Wednesday May 2016

Posted by farreachvoyages in Modifications, Uncategorized

≈ Leave a comment

18 May 2016–The Far Reach, Anchored, in the Lagoon, St Maarten.

A couple days ago I completed the installation of the halyard diverter.

image

The halyard diverted is installed.  It should keep the halyard lined up with the sheave and eliminate the chafe.

The day before the installation, I pulled both jib halyards out of the mast replacing them with messenger lines on. I did not want the halyards to get covered with metal shaving from the drilling at the top of the mast.

The next morning I got an early start and went up the mast to install the part and the headstay was in the way of the drill–couldn’t fit the drill between mast and headstay. I should have seen that earlier but I just looked right past it. Anyway, I hauled up a spectra line and tied it to the spinnaker bail then went down the mast and slacked the headstay and back stay and bob stay. Tied the block and tackle on the the spectra line and hauled it tight. Went back up the mast and removed the headstay at the tang and lowered it a couple feet on a line and tied it off to the top of the cap shroud. Then installed the part. I used some double sided carpet tape to hold the part in place, drilled and tapped five holes which did not take long–maybe 20-25 minutes, ran the fasters home with tef-gel, and “Bob’s your uncle.” The part lined up perfectly.

Continue reading →

Newer posts →

Categories

Archives

Blog at WordPress.com.

  • Subscribe Subscribed
    • Far Reach Voyages
    • Join 56 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Far Reach Voyages
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...