
This is part IV and the conclusion of the engine installation project.
This post covers installing the inboard engine, installing the fuel system, aligning the shaft, building and installing battery boxes and the batteries and cables, installing the engine throttle control head, starting and test running the engine, stripping and reapplying barrier coat and anti fouling paint, installing the two blade folding propeller and making final preparations for relaunching the Far Reach after 20 months on the hard.
Continue reading